PONTE ALBANITO WIND FARM

Renexia obtained authorisation to construct and operate a wind farm representing 22.8MW of power in October 2012. It also has the authorization for smaller works relating to the connection of the electricity produced to the national electric utility network Enel. The wind farm is to be built in Ponte Albanito in Foggia.

The wind farm is able to develop about 55.8 GWh a year into working energy, corresponding to 27680 tons of CO2 not emitted and 12834 TPE in energy savings. It will provide electricity for 5943 average families a year.

The wind farm is operative since May 29th 2014 and has been sold to CVA - Compagnia Valdostana delle Acque on January 2015.

 

 

   
 